{"id":30169,"date":"2024-08-23T08:18:23","date_gmt":"2024-08-23T07:18:23","guid":{"rendered":"https:\/\/letempsmag.ma\/?p=30169"},"modified":"2024-08-23T08:18:23","modified_gmt":"2024-08-23T07:18:23","slug":"lonee-se-penche-sur-la-liaison-electrique-nationale-tres-haute-tension","status":"publish","type":"post","link":"https:\/\/letempsmag.ma\/?p=30169","title":{"rendered":"L&#8217;ONEE se penche sur la liaison \u00e9lectrique nationale Tr\u00e8s Haute Tension"},"content":{"rendered":"\n<p>Dans le cadre de l\u2019acc\u00e9l\u00e9ration de la r\u00e9alisation du projet strat\u00e9gique de la liaison \u00e9lectrique Tr\u00e8s Haute Tension de 3GW reliant le Sud au Centre du Royaume, l\u2019Office National de l\u2019\u00c9lectricit\u00e9 et de l\u2019Eau potable (ONEE) a proc\u00e9d\u00e9, le 21 ao\u00fbt dernier, au lancement d\u2019un Appel d\u2019Offres pour la r\u00e9alisation d\u2019\u00e9tudes topographiques relatives aux lignes a\u00e9riennes de cette liaison.<\/p>\n\n\n\n<p>Ces \u00e9tudes visent \u00e0 d\u00e9terminer les trac\u00e9s optimaux des lignes Tr\u00e8s Haute Tension en vue d&#8217;anticiper les contraintes g\u00e9ographiques, et identifier et d\u00e9limiter les sites devant abriter les stations terminales au Sud et au Centre.<\/p>\n\n\n\n<p>Rappelons que ce projet consiste en la r\u00e9alisation d\u2019une liaison \u00e9lectrique d\u2019une capacit\u00e9 de 3 GW entre le sud et le centre du Royaume, renfor\u00e7ant ainsi l&#8217;infrastructure \u00e9nerg\u00e9tique nationale et favorisant l&#8217;int\u00e9gration optimis\u00e9e des \u00e9nergies renouvelables.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Dans le cadre de l\u2019acc\u00e9l\u00e9ration de la r\u00e9alisation du projet strat\u00e9gique de la liaison \u00e9lectrique Tr\u00e8s Haute Tension de 3GW reliant le Sud au Centre du Royaume, l\u2019Office National de l\u2019\u00c9lectricit\u00e9 et de l\u2019Eau potable (ONEE) a proc\u00e9d\u00e9, le 21 ao\u00fbt dernier, au lancement d\u2019un Appel d\u2019Offres pour la r\u00e9alisation d\u2019\u00e9tudes topographiques relatives aux lignes &hellip;<\/p>\n","protected":false},"author":9,"featured_media":30170,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[78],"tags":[],"class_list":["post-30169","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-energie"],"_links":{"self":[{"href":"https:\/\/letempsmag.ma\/index.php?rest_route=\/wp\/v2\/posts\/30169","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/letempsmag.ma\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/letempsmag.ma\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/letempsmag.ma\/index.php?rest_route=\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/letempsmag.ma\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=30169"}],"version-history":[{"count":1,"href":"https:\/\/letempsmag.ma\/index.php?rest_route=\/wp\/v2\/posts\/30169\/revisions"}],"predecessor-version":[{"id":30171,"href":"https:\/\/letempsmag.ma\/index.php?rest_route=\/wp\/v2\/posts\/30169\/revisions\/30171"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/letempsmag.ma\/index.php?rest_route=\/wp\/v2\/media\/30170"}],"wp:attachment":[{"href":"https:\/\/letempsmag.ma\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=30169"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/letempsmag.ma\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=30169"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/letempsmag.ma\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=30169"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}